Accessibility

WCAG 2.2 AA

Text Adjustments

Font Size
Letter Spacing
Line Height

Visual Adjustments

Invert
Monochrome
Highlight Links
Big Cursor

সাম্প্রতিক অনুসন্ধান

Contact

EARN প্রকল্প জাতীয় ক্রীড়া পরিষদ ভবন লেভেল-১৯, ৬২/৩, পুরানা পল্টন ঢাকা-১০০০

Searching...

কোনো ফলাফল পাওয়া যায়নি

Solar Panels Installed to Ensure Uninterrupted Power Supply at All District Offices of Youth Development

Solar Panels Installed to Ensure Uninterrupted Power Supply at All District Offices of Youth Development

This initiative was undertaken to ensure uninterrupted power supply to Youth Development offices by connecting them to the national grid through net metering, while also generating a source of future revenue.

Under the net energy metering process, electricity generated by rooftop solar panels is first consumed by the user, and any surplus is fed into the national distribution grid. A bidirectional meter tracks the electricity supplied. If the amount of electricity fed into the grid exceeds consumption, the government will reimburse the customer for the surplus at the end of the financial year.

Under the solar panel installation program, each Youth Development office has been equipped with a 33-kilowatt on-grid solar system, a lightning protection system, a net meter, and an online monitoring system for remote monitoring. The total system capacity is 2,112 kilowatts. Each site includes solar panels, an inverter, an online monitoring system, stands and mounting structures, wiring and safety systems, a lightning protection system, air terminals, surge protection devices, down conductors, an earthing system, and commissioning and testing arrangements.

Division-wise Solar Panel Installation:

A contractor firm named Fibonacci JV installed solar panels across a total of 32 districts — comprising 13 districts in Dhaka Division, 4 in Mymensingh Division, 11 in Chattogram Division, and 4 in Sylhet Division.

The districts in Dhaka Division are: Dhaka, Narayanganj, Manikganj, Narsingdi, Munshiganj, Gazipur, Kishoreganj, Tangail, Faridpur, Madaripur, Shariatpur, Rajbari, and Gopalganj. Mymensingh Division: Sherpur, Jamalpur, Netrokona, and Mymensingh. Chattogram Division: Chattogram, Cox's Bazar, Khagrachhari, Chandpur, Rangamati, Chuadanga, Feni, Cumilla, Bandarban, Brahmanbaria, and Noakhali. Sylhet Division: Sylhet, Moulvibazar, Sunamganj, and Habiganj.

A firm named Filament Science JV installed solar panels across the remaining 32 districts — comprising 8 districts in Rajshahi Division, 8 in Rangpur Division, 6 in Barisal Division, and 10 in Khulna Division.

Rajshahi Division: Rajshahi, Natore, Naogaon, Pabna, Joypurhat, Chapainawabganj, Bogura, and Sirajganj. Rangpur Division: Rangpur, Kurigram, Panchagarh, Gaibandha, Lalmonirhat, Thakurgaon, Nilphamari, and Dinajpur. Barisal Division: Barisal, Bhola, Barguna, Patuakhali, Pirojpur, and Jhalokati. Khulna Division: Khulna, Jashore, Satkhira, Bagerhat, Magura, Narail, Jhenaidah, Kushtia, Chuadanga, and Meherpur.

Following the installation and commissioning of the solar panels, electricity bills at youth training centers have reduced by approximately one-third on average. Dependence on the national grid has decreased significantly. Uninterrupted power supply has been ensured for training and administrative activities, as well as for the operation of computer labs. Furthermore, the reduction in fossil fuel consumption has made the entire power supply system more environmentally sustainable.

Read More

Review Meeting Held on EARN Project Inception Reports

Review Meeting Held on EARN Project Inception Reports

A review meeting on the inception reports prepared by the Service Providers (SPs) engaged under the Economic Acceleration and Resilience for NIT (EARN) Project, implemented by the Department of Youth Development (DYD), was held on Saturday, 5 September.

8 September, 2026
Details
Launch of the EARN Project Portal

Launch of the EARN Project Portal

The Secretary of the Ministry of Youth and Sports, Md. Mahbub-ul-Alam, formally inaugurated the online portal of the EARN Project, being implemented by the Department of Youth Development. The inauguration was declared on Tuesday, 28 July, at 11:30 AM in the Ministry's conference room, where the Secretary officially launched the portal by pressing the designated button.

28 July, 2026
Details
Workshop on Priority Skills Identification & Online Training Content Development

Workshop on Priority Skills Identification & Online Training Content Development

A workshop titled 'Identifying Priority Skills and Online Training Content Development (OTSP)' was held on 15 July 2026 at the project office under the Economic Acceleration and Resilience for NEET (EARN) project. The primary objective of the workshop was to identify and validate the priority skills — including technical skills, digital literacy, soft skills, and entrepreneurship development — and content categories required for the online training of 25,000 NEET youth out of the project's total 900,000 beneficiaries.

16 July, 2026
Details
A New Era of Youth Administration Through Information Technology & Real-Time Monitoring

A New Era of Youth Administration Through Information Technology & Real-Time Monitoring

Youth administration is being comprehensively restructured through the integration of fully digital and modern technologies, with the aim of ensuring transparency and accountability in government project implementation and delivering services more efficiently.

6 July, 2026
Details
Department of Youth Development's 'Seed Fund' to Create 15,000 New Entrepreneurs for Youth

Department of Youth Development's 'Seed Fund' to Create 15,000 New Entrepreneurs for Youth

Even after receiving technical training, many rural youth are unable to start businesses due to a lack of capital and proper guidance. To address this financial and strategic challenge faced by rural youth, the Department of Youth Development (DYD) has undertaken a major initiative to modernize and expand its existing Seed Fund. Through the EARN Project, this fund is being made fully digital and adapted to meet the demands of the modern era.

6 July, 2026
Details
Training of Trainers (ToT) held for EARN Project

Training of Trainers (ToT) held for EARN Project

A day-long Training of Trainers (ToT) on ‘Beneficiary Identification and Selection’ was held on August 27, 2026 in the seminar room of Economic Acceleration and Resilience for NEET (EARN) project office, implemented by the Department of Youth Development.

30 August, 2026
Details
Women Prioritized in the EARN Project — Rural Social Barriers to Be Addressed

Women Prioritized in the EARN Project — Rural Social Barriers to Be Addressed

The NEET youth challenge in Bangladesh is fundamentally a gender issue. Of the 12.6 million NEET youth, approximately 90 percent are women. A World Bank study found that rigid social norms, lack of safe transportation, and the disproportionate burden of domestic responsibilities are the primary barriers preventing women in rural areas from becoming economically self-reliant.

6 July, 2026
Details
Breaking Free from Unemployment: A Landmark Employment Project Coming for 12.6 Million NEET Youth

Breaking Free from Unemployment: A Landmark Employment Project Coming for 12.6 Million NEET Youth

To ensure the economic advancement of Bangladesh's vast youth population and to reintegrate young people outside the mainstream of employment and education, the government has launched a landmark mega project.

6 July, 2026
Details
Workshop on the Development of the Communication Strategy Paper

Workshop on the Development of the Communication Strategy Paper

A workshop titled 'Stakeholder Consultation Workshop' has been held under the 'Economic Acceleration and Resilience for NEET (EARN)' project of the Department of Youth Development.

1 July, 2026
Details